2217 Lindell Ave

December 8, 2023
SURVEY FOR PERFECT PLACEMENT
David Young came out today and placed about 30 nails for where the walls are going to land to make sure the masons are going to be 100% accurate in their placement of the blocks. This is much more precise than the old days of pull a line and it's close enough.
Surveyor came today and placed nails and marks for the corners of all of the walls and buiding. David Young and Darrens got us down to a hundredth of a foot placement. Survey tools simply amaze me with the depth of accuracy that they have. GPS RTK is amazing. Their base station plus rover was even more mind blowing. Next step the masons!